Leeds Commercial Office
Completed 30 ventilation hygiene tests at a commercial office building in Leeds, including DDT and microbiological sampling, providing laboratory analysis and a complete assessment of system hygiene within two weeks.
Leeds Commercial Office · Corporate · Leeds · 2026
The challenge
The challenge.
Assessing Ventilation Hygiene
The client required an independent assessment of the hygiene condition of the ventilation system to understand contamination levels and identify whether remedial cleaning was required. The project included 30 individual test locations throughout the system using both Deposit Thickness Testing (DDT) and microbiological swab sampling.
During the survey, several areas of the ductwork were inaccessible, preventing representative testing from being carried out. Access improvements were therefore required before the hygiene assessment could be completed.
Our approach
Our approach.
Comprehensive Hygiene Assessment
Our engineers installed the necessary access points to safely reach all required testing locations before carrying out the hygiene assessment. Each test location was sampled using Deposit Thickness Testing (DDT) together with microbiological swab sampling, with all samples submitted to an accredited laboratory for analysis.
Working to a tight programme, the entire process—from the initial enquiry through testing, laboratory analysis and final reporting—was completed within two weeks, providing the client with a rapid understanding of the system’s condition.
The results
The results.
Complete Visibility of System Hygiene
All 30 test locations were successfully completed, providing the client with a comprehensive overview of the hygiene condition throughout the ventilation system. The combination of DDT results and microbiological laboratory analysis enabled informed decisions regarding future ventilation hygiene requirements and any remedial actions.
The completed report included laboratory certificates, test results, photographic evidence and recommendations, giving the client a clear, evidence-based assessment of the ventilation system.
30
Test Locations
2
Test Methods
2
Week Turnaround
100%
System Assessed
Speak to the team
Ready when you are.
Get a clear, no-obligation quotation — or call and talk it through with an engineer first.